Monday, March 30, 2009

Roof Framing


The roof has been framed and sheathed.  The final miscellaneous framing items are being completed.

Friday, March 20, 2009

Second Floor Framing



The walls on the second floor have been framed.

Second Floor Sheathing


The deck of the second floor has been sheathed as well as the exterior walls of the first floor.  The bottom plates of the second floor walls have been installed.  Don Porter (GreenBuildIt team member) inspects the work.

Framing/Insulation Efficiencies


Two stud corners are used to minimize material use and to enable insulation to reach more surface area of the exterior wall.

First Floor Framing



Walls are being erected on the first floor.  All home dimensions are increments of 4' so that material waste and framing labor are be minimized.  The framing crew decreed that this is the least material waste that they have ever seen on a project.

Wednesday, March 18, 2009

Foundation Envelope Sealing


As the foundation framing members are assembled, all joints and connections are caulked to prevent air leakage.

Tuesday, March 17, 2009

Foundation Framing



The "box" is constructed of continuous TJI beams @ 24" on center.  This design facet has made assembly a breeze.  After days of rain we have completed the "box" and passed inspection.  We are now ready to lay the subfloor and begin framing the walls.