Saturday, June 13, 2009
Begining Cabinetry Installation
Base and top cabinets have been installed in kitchen and countertops are being templated. The flat maple panel cabinets have been finished with a water based material. This vastly reduces VOC emission in the home.
Tuesday, June 9, 2009
Interior Paint
Monday, June 8, 2009
Tile Installation
Thursday, June 4, 2009
Subscribe to:
Posts (Atom)