Begining Cabinetry Installation


Base and top cabinets have been installed in kitchen and countertops are being templated. The flat maple panel cabinets have been finished with a water based material. This vastly reduces VOC emission in the home.

Tuesday, June 9, 2009

Interior Paint


Interior paint has been applied. The paint material conforms to LEED definition of low VOC material. This makes a safer work environment and a healthier house to live in.

Monday, June 8, 2009

Tile Installation


Ceramic tile is being installed in bathrooms, foyer, and laundry area. Installing materials that are water resistant in wet locations contributes to one LEED point.

Thursday, June 4, 2009

Interior Trim



Interior trim is being installed.