Friday, April 17, 2009

Electrical Rough In


The 200 amp electrical system has been installed and all circuits wired.  We have also installed conduit that links the attic space to the crawl space and then to the main electrical panel.  This will allow photovoltaic cells and/or solar hot water systems to be installed on the roof at a later date with little disruption.  The house is in essence "solar ready" and can accept technologies that may become more affordable in the future.

No comments:

Post a Comment