Friday, March 20, 2009

First Floor Framing



Walls are being erected on the first floor.  All home dimensions are increments of 4' so that material waste and framing labor are be minimized.  The framing crew decreed that this is the least material waste that they have ever seen on a project.

No comments:

Post a Comment